Plan Documents

Signed Plan Resolution (<1MB)

Project Overview Brochure (6MB)

Project Overview Brochure, Spanish Version (6MB)

Project List (2MB)

Plan Report (2.5MB)

Study Report, Full Report Without Appendices (21MB)

Study Report Chapters and Appendices

Cover and Table of Contents (1.5MB)

Introduction and Stakeholder Engagement (2.6MB)

Existing Transportation System Conditions (4.5MB)

Forecast Conditions and Assessment of Regional Improvement Strategies (<1MB)

Evaluation of Corridor Improvement Strategies (11MB)

Plan Recommendations and Implementing the Plan (6MB)

All Appendices, except B-3 LOS Worksheets (29MB)

Appendix A – Stakeholder Engagement Plan and Summaries (22MB)

Appendix B1 – Level of Service Definitions and B2 – PM Peak Hour Level of Service Summaries 2009,2018 Forecast, 2028 Forecast (<1MB)

Appendix B-3 –PM Peak Hour Level of Service Worksheets 2009,2018 Forecast, 2028 Forecast (<1MB)

Appendix C – Market assessment for North Wenatchee Avenue Transportation Master Plan (1MB)

Appendix D Cost Estimating Process and Assumptions (<1MB)

Appendix E – Confluence Parkway Concept in Olds Station(4.5MB)

Appendix F – Potential Preliminary Concepts for North Wenatchee Avenue in Vicinity of Maiden Lane and Horse Lake Road (6.5MB)

Appendix G – Confluence Parkway Preliminary Phasing Plan (1.2MB)

 

 

 

 

 






What is the North Wenatchee
Transportation Master Plan?

SR285 Master Plan Adopted by Council

On February 10, 2011 the Wenatchee Valley Transportation Council adopted the North Wenatchee Transportation Master Plan. A copy of the signed resolution is included here.

SR285 Master Plan - Public Comment Period EXTENDED

The Public Comment Period on the DRAFT SR285 Master Plan has been extended until January 31, 2011, to allow time for additional public input on the Plan. This is in advance of the Wenatchee Valley Transportation Council's regularly scheduled Executive Board meeting on February 10, 2011, at which time staff will be requesting adoption of the SR285 Master Plan. If you have any input on the DRAFT SR285 Master Plan we encourage you to let us know!

The North Wenatchee Transportation Master Plan (Plan) includes an integrated set of transportation improvements to address the range of study issues. The most significant improvements include construction of the new “Confluence Parkway” corridor and modifications to the interchanges along US 2 and SR 285. In addition, new over- and under-crossings are planned to reduce delays and conflicts between travel modes and to enhance traffic flow and safety. New major pedestrian and bicycle facilities are included, as is a new North Wenatchee Transit Center. The major improvements are supported by a wide range of other projects and programs to complete a functional multimodal transportation system to meet the existing and future travel demands and support economic development within the study corridor and throughout the region.

The Plan consists of three major components:

The corridor improvements tie together to provide comprehensive transportation benefits to the region. The Plan was developed with public and stakeholder input and is currently available for public comment. We are seeking public input prior to January 12, 2011. Comments can be made by calling (509) 663-9059 or through the Wenatchee Valley Transportaion Council online comment form.

Where Can I Learn More?

The corridor improvements tie together to provide comprehensive transportation benefits to the region. The Plan was developed with public and stakeholder input and is currently available for public comment. We are seeking public input prior to January 12, 2011. Comments can be made by calling (509) 663-9059 or through the Wenatchee Valley Transportaion Council online comment form.

How Can I Get Involved?

To provide comments or obtain additional information please contact the Wenatchee Valley Transporation Council by:

phone at (509) 663-9059
or
through the online comment form.

Wenatchee Valley Transportation Council
300 South Columbia Street
Wenatchee, WA 98801